Room geometry
Reflected ceiling plan, wet-zone dimensions, finished build-up and available service void.
Concealed coordination
Meteor 300D demonstrates the concealed approach: define the opening, support, services and access before the finished plane closes.
Inside the ceiling
Follow the assembly from structural support to room-side access.
SupportWaterPower
Schematic assembly · not a construction drawing.
Step 01 · Hang
The structural support and product frame are positioned from the approved reflected ceiling plan. Adjustment should allow the finished shower face to align with the final ceiling surface rather than inheriting inaccuracies from the board or tile build-up.
At framework stage, this sequence is intentionally model-neutral. Final fixing points, product weight, opening size and required void depth must be taken from the approved technical drawing for the selected Meteor configuration.
Step 02 · Connect
Water inlets, mixer location, lighting supply and—where selected—audio connections need defined routes before closure. Separating wet services from protected electrical components is a project requirement, not a styling decision.
Provide the project desk with available pressure, intended functions, ceiling build-up, control location and regional electrical requirements. The resulting submission should identify the correct connection positions and service strategy.
Step 03 · Close and service
The ceiling finish closes around the approved opening, after which the room-side assembly completes the visual plane. The project documentation should state which components remain removable, where isolation occurs and what access must be preserved.
Do not assume that every Meteor model shares the same opening, depth or service method. This page communicates the design sequence; the model-specific drawing remains the source of truth for construction.
Information checklist
Reflected ceiling plan, wet-zone dimensions, finished build-up and available service void.
Selected Meteor model, water functions, control position, finish and expected operating sequence.
Supply pressure, drainage position, power standard, isolation strategy and maintenance access.
Your next step
Start with your shower area, room types and quantity. We will help you confirm the configuration before drawings and quotation.
5 setsMinimum order · mix series
1 business dayFirst reply · quotation timing confirmed separately